Document ISO/IEC/JTC 1/SC 22/WG 23 N1348

Draft Agenda Meeting #76
ISO/IEC JTC 1/SC 22/WG23

20 November 2023 1900-2200 UTC


Meeting Location :

Hi,



Stephen Michell is inviting you to a scheduled Zoom meeting.

Topic: SC 22/WG 23 Meeting 76

Time: Nov 20, 2023 1900 UTC

Join from PC, Mac, Linux, iOS or Android: https://iso.zoom.us/j/99915824542?pwd=NHFzRFhtNzNZekpMakFmZTRUeTJjdz09

Password: 287440



Or iPhone one-tap :

US: +16027530140,,99915824542# or +16465189805,,99915824542#

Or Telephone:

Dial(for higher quality, dial a number based on your current location):

US: +1 602 753 0140 or +1 646 518 9805 or +1 646 876 9923 or +1 651 372 8299 or +1 669 219 2599 or +1 669 900 6833 or +1 720 928 9299 or +1 786 635 1003 or +1 971 247 1195 or +1 206 337 9723 or +1 213 338 8477 or +1 253 215 8782 or +1 267 831 0333 or +1 301 715 8592 or +1 312 626 6799 or +1 346 248 7799 or +1 408 638 0968 or +1 470 250 9358 or +1 470 381 2552 or 877 853 5247 (Toll Free) or 888 788 0099 (Toll Free)

Meeting ID: 999 1582 4542

Password: 287440

International numbers available: https://iso.zoom.us/u/adJHsaPn1J

Or Skype for Business (Lync):

https://iso.zoom.us/skype/99915824542

Agenda

76.1 Opening activities

76.1.1 Opening Comments

76.1.2 Introduction of Participants/Roll Call

76.1.3 Procedures for this Meeting

76.1.4 Approval of previous Minutes of meeting 75

76.1.6 Approval of Agenda

76.1.7 Future Meeting Schedule

The main meeting schedule is to progress documents in sub-WG meetings. On an as-needed basis a meeting of the full group is scheduled to progress work to SC 22 for ISO balloting, to propose to SC 22 add or remove documents from the WG 23 schedule and to manage general WG 23 work.



76.2 Liaison Activities (for in-person meetings only)

76.2.1 PL22.3/WG5 (Fortran)

76.2.2 WG4 (COBOL)

76.2.3 WG9 (Ada) Erhard Ploedereder

76.2.4 PL22.11/WG14 C Clive Pygott

76.2.5 PL22.16/WG21 (C++) Michael Wong
76.2.6 MISRA C Clive Pygott

76.2.7 MISRA (C++) Clive Pygott

76.2.8 SPARK Erhard Ploedereder

76.2.9 Other Liaison Activities or National body reports

76.3. Report from SC 22 (Convenor)

DIS 24772-1 was submitted to ISO for DIS balloting, which happened from Jan 3 to March 25 2023. The document passed with 100% approval (16 of 16 P members voted yes. The document has many comments, which WG 23 has reviewed and made the necessary corrections. The document has been submitted and accepted for FDIS ballot.

Progress of Part 2 Ada – Ada is complete and awaiting the ballot for the Part 1, since ISO decisions will likely require significant editing. Recent changes to the form and content of documents by the ISO editor will necessitate some changes to the Ada document to eliminate any language that can be interpreted as a requirement. This meeting is being asked to approve the edit of this document to meet ISO editorial requirements.

Progress of Part 3 C – C is complete and awaiting the ballot for the Part 1, since ISO decisions will likely require significant editing. Recent changes to the form and content of documents by the ISO editor will necessitate some changes to the C document to eliminate any language that can be interpreted as a requirement. This meeting is being asked to approve the edit of this document to meet ISO editorial requirements.

Progress of Part 4 Python – Python is almost complete. Recent changes to the form and content of documents by the ISO editor necessitate some changes to this document to eliminate any language that can be interpreted as a requirement. These have been implemented in the most recent Python documents posted.

Progress of Fortran (Part 8) – The Fortran members working on this document, along with the convenor and Mr. Ploedereder and judge this document to be complete. The full Fortran committee (WG 5) has reviewed the document and returned it to the subgroup for final polishing and progression towards DIS ballot. The document is N1327.This meeting is being asked to approve this document for submission to SC 22 for DIS ballot.

Progress of Part 6 SPARK – SPARK is complete and awaiting the ballot for the Part 1, since ISO decisions will likely require significant editing. Recent changes to the form and content of documents by the ISO editor will necessitate some changes to this document to eliminate any language that can be interpreted as a requirement. This meeting is being asked to approve the edit of this document to meet ISO editorial requirements.

Progress of Part 10 C++ - work is ongoing.

Progress of Part 11, Java – So far, Oracle has refused to pass any document that addresses Java vulnerabilities to the Java community for comment. Recent interactions with Oracle have broken the log jam and should result in a broader review of the document.

76.4 Document Review

N1326 WG 24772-8 Fortran language vulnerabilities

76.6 Review of Assignment of responsibilities

76.7 Resolutions and Action Items

76-1 To submit document N1327 Fortran vulnerabilities to SC 22 to initiate DIS ballot.

76-2 To return N1166 Ada language vulnerabilities to the editing team for language readjustment to remove language that could be interpreted as imposing requirements from the document.

76-3 To return N1156 SPARK language vulnerabilities to the editing team for language readjustment to adjust language that could be interpreted as imposing requirements from the document.

76-4 To return N0920 C language vulnerabilities to the editing team for language readjustment to remove language that could be interpreted as imposing requirements from the document.

76.8. Adjournment