From willemw@komp  Sun Aug  3 12:52:37 1997
Received: from komp.ace.nl (komp.ace.nl [193.78.104.90]) by dkuug.dk (8.6.12/8.6.12) with SMTP id MAA13118 for <sc22wg11@dkuug.dk>; Sun, 3 Aug 1997 12:52:37 +0200
Received: by komp.ace.nl with SMTP id AA04205 (1.14/2.17);
	  Sun, 3 Aug 97 12:49:26 +0200 (MET)
To: sc22wg11@dkuug.dk
Subject: SC22/WG11 N439 - WG11 Business Plan
From: Willem Wakker <willemw@ace.nl>
Reply-To: Willem Wakker <willemw@ace.nl>
Date: Sun, 03 Aug 97 12:49:25 N
Message-Id: <4203.870605365@komp>
Sender: willemw@komp.ace.nl


Please find appended the WG11 business plan, according to the
supplied template for such plans. The document is submitted
to SC22. Any comment is welcome.

Regards, Willem.

aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Willem Wakker					 email: <willemw@ace.nl>
cccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccc
ACE Consulting bv				     tel: +31 20 6646416
van Eeghenstraat 100				     fax: +31 20 6750389
1071 GL  Amsterdam, The Netherlands
eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee



WG11 Business Plan			      SC22/WG11 N439



BUSINESS PLAN FOR JTC 1/SC22 WG11



PERIOD COVERED: September 1996	-  July 1997



SUBMITTED BY:

W. F. Wakker (Convener JTC 1/SC22 WG11)
ACE Consulting bv
Van Eeghenstraat 100
1071 GL, Amsterdam, Netherlands
Email: willemw@ace.nl



1.  MANAGEMENT SUMMARY:

1.1  JTC 1/SC22 WG11 STATEMENT OF SCOPE

Development of ISO/IEC Standards and Technical Reports related to Binding
Techniques and (Programming) Language Independent Issues.

1.2  PROJECT REPORT

1.2.1  COMPLETED PROJECTS
JTC1.22.14 -- TR 10182:1994: Language Bindings Guidelines

JTC1.22.16 -- ISO/IEC 13886:1996 - Language Independent Procedure Calling

JTC1.22.17 -- ISO/IEC 11404:1996 - Language Independent Datatypes

JTC1.22.28 -- ISO/IEC 10967-1:1994 - Language Independent Arithmetic, Part
1: Integer and Floating Point Arithmetic

1.2.2  PROJECTS UNDERWAY
JTC1.22.33 -- (F)CD 10967-2 - Language Independent Arithmetic, Part 2:
Elementary Numerical Functions
The FCD was ballotted (closing date: June 1997; a meeting has to be called
to discuss the ballot comments.
No project editor is available.

JTC1.22.33 --  WD 10967-3 - Language Independent Arithmetic, Part 3:
Complex Floating Point Arithmetic and Complex Elementary Numerical
Functions
The work on this part of IS 10967 will follow (in time) the work on part 2,
No project editor is available.

JTC1.22.46 -- WDTR 14369 - Guidelines for the Preparation of Language
Independent Service Specifications
Although a lot of work has been done on this document (see Review and
Comment version SC22 N2470) its future remains unclear.
No project editor is available.

1.3  COOPERATION AND COMPETITION

The WG11 documents are mainly produced to be used by other programming
language committees.  Therefore, WG11 maintains liaisons with many of the
SC22 WGs.


2.  PERIOD REVIEW



2.1  MARKET REQUIREMENTS

There are no clearly defined market requirements for the WG11 projects;
however several ISO/IEC standards make reference to the documents.  There
is thus apparently an indirect market requirement.

2.2  ACHIEVEMENTS

Despite the sometimes small participation in WG11, a number of high quality
ISO standards have been produced.

2.3  RESOURCES

WG11 resources have been a problem for the past years, and are even more a
problem now.  Attendance is very low, and no project editors are available.


3.  FOCUS NEXT WORK PERIOD

3.1  DELIVERABLES

Two projects (LIA-2 and LISS) should progress to their next stages; the
progression will be discussed at a WG11 meeting in the last quarter of
1997.

3.2  STRATEGIES

3.2.1  RISKS
Participation and lack of editors is a clear risk for the progression of
the WG11 work.

The SC22 Member Bodies are invited to provide resources so that WG11 at
least can finalize its current work items.

3.2.2  OPPORTUNITIES
No further opportunities have been identified.

3.2.3  WORK PROGRAM PRIORITIES
The finalization of LIA-2 has the highest priority.

